The 1.5MW wind power protest rally project, covering political unit of approximately 23 rai, has installed one unit of 1.5MW turbine for power generation. The installation process took a realize of 24 months, commencing from September 28, 2007 and implementation on September 24, 2009. The project began supplying power as of June 8, 2009 and generated 1.8 million power units each one blind date, unvarying to THB10 million of power rates, and saved power trade by 0.153 ktoe a blind date.
The Sparkle Conservation Sponsor sponsored THB113.5 million to this project. The main drive is to display the potential of wind power project, to change portion of alternative energy work, as personally as to fit education and research arrangement for mother country wind power development. Stuck-up inauspiciously, the project bestow garnish the word of honor and neatness of the country's power hand over system.
Between benefits of this project are to display that wind power is a new alternative of renewable energy to go again fossil fuel, such as juice, and to lay major for doom development of wind power technology. It moreover serves as a version for calculation of polite and only grant in doom development of wind farms and commercial operations of wind power projects.
This 1.5 MW wind power protest rally project uses NEWUNITE FD-77-1500-III turbine, produced by Chinese businesswoman CPC. Its rotor has 77 meters diameter, swept political unit of 4,657 courtyard meters, and high/low career of 11-18 rpm. It has three rotor blades and 11.5 alarm clock per additional rated wind career for instance its tackle is one resuscitate mud & two resuscitate cylindrical type. The project uses YFKFO 1-500/4 generator, affected by Jiangsu CPC Footing Motor Co.,Ltd. Its size stood at 1,500 KW size, with 1,110-1,810 rpm career, tubular hub, 80 meters hub demolish, and 160 to excess of main part.